Kennesaw News

Loading Events

« All Events

  • This event has passed.

Groundbreaking Ceremony

January 19 @ 4:00 pm - 5:00 pm

Join the City of Kennesaw and Kennesaw Parks & Recreation for a groundbreaking ceremony for phase eight of Depot Park tomorrow, January 19, at 4:00 PM!

Phase eight of the Depot Park Master Plan includes the amphitheater and festival area. Upon completion, the amphitheater will feature a 50 x 42 ft. stage, with back of house. The amphitheater will hold up to 2,000 people on the turf lawn. In addition to the stage, construction includes a restroom, storage facility and renovation of the Community House to serve as the green room for performers. The amphitheater will be host to City events & concerts.

In 2015, the City of Kennesaw began planning for updates and improvements to the original Depot Park Master Plan (which had been adopted in 2008). The master plan was updated to include multiple program changes.

To date, Phases 1-7 have been completed.
• Phase 1: Museum ADA & Underpass
• Phase 2: Land Acquisition
• Phase 3: Gateway Park
• Phase 4: Engineering & Permitting
• Phase 5: Grading & Wetland Mitigation
• Phase 6: Depot Park Parking Improvements
• Phase 7: Parking Lawn & Upper Meadow
• Phase 8: Amphitheater & Festival Area

The Depot Park project is funded through SPLOST.

* The images included below are concept drawings for the project.

Details

Date:
January 19
Time:
4:00 pm - 5:00 pm
Event Category:

Venue

Depot Park
2828 Cherokee Street NW
Kennesaw, GA 30144 United States
+ Google Map

<div style=”min-height: 200px;”></div>